勤益科大機構典藏:Item 987654321/1277
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 2928/5721 (51%)
Visitors : 377212      Online Users : 167
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncut.edu.tw/handle/987654321/1277


    Title: 跨廠區之多製造廠訂單分派決策模式構建
    The Construction of Order Allocation Between Multi-Site
    Authors: 胡雅惠
    Hu, Ya-Huei
    Contributors: 工業工程與管理系
    Keywords: 訂單分派;多廠規劃
    order allocation;multi-site planning
    Date: 2004
    Issue Date: 2008-10-06 13:31:45 (UTC+8)
    Abstract: 隨著經濟環境與產業結構的改變,企業的獲利空間已逐漸緊縮,彼此之間的競爭亦更加激烈。面對如此變化萬千的環境,一家成功的企業除需具備優良的團隊和正確的決策外,更重要的是需有效整合企業內部資源,以更短的生產週期快速回應顧客的交期,滿足顧客多樣化的需求。
    當企業面臨單一廠產能不足時,便可能需要其他區域的製造廠或將部份訂單外包給其他製造廠協助生產,因此,如何將顧客訂單分派給各個製造廠生產的問題,就顯得格外重要。
    在本研究中,將針對跨廠區製造廠在全面訂單管理的情況下,探討在一健全的訂單管理制度下,對於製造廠的跨廠區訂單分派模式進行研究,建立一個考慮到多製造廠在接收大量訂單時,如何依據產品的市場銷售特性、訂單交期、各廠的產能負荷、訂單利潤等交叉複雜的關係,建立一跨廠區整合型之訂單分派的決策模式。
    本研究利用線性規劃建立一訂單分派數學模式,探討跨廠區之訂單分派問題,並以總成本和總完工時間最小為評估準則。導入傳統派工方式EDD、SPT和LPT,做為訂單分派至製造廠生產的法則,以決定訂單的最佳配置,並利用eM-plant模擬該模式,將其結果進行比較分析,以驗證本模式之可行性。
    Appears in Collections:[Development of Industrial Engineering and Management] 【工業工程與管理系所】博碩士論文

    Files in This Item:

    File SizeFormat
    0KbUnknown1337View/Open


    All items in NCUTIR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback