勤益科大機構典藏:Item 987654321/1310
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 2928/5721 (51%)
Visitors : 1429608      Online Users : 940
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncut.edu.tw/handle/987654321/1310


    Title: 以Connector為基之拆裝規劃
    Disassembly Sequence Planning Base On Connector Concept
    Authors: 何承叡
    Ho, Ray
    Contributors: 工業工程與管理系
    Keywords: 物料清單;拆裝順序規劃;連結者-部件圖;釋放圖
    Bill of Material;Disassembly Sequence Planning;Connector-Part Diagram;Release Diagram
    Date: 2007
    Issue Date: 2008-10-06 13:32:16 (UTC+8)
    Abstract: 地球資源有限,環保意識逐漸高漲,為了因應時代的趨勢並對社會負責,許多企業紛紛建立對於廢棄物的處理機制。為了處理這些廢棄物,拆裝規劃是必須考量的重點。拆裝是藉著解除零件與零件間的結合狀態使零件彼此獨立,然後可以選擇適當的處理策略(例如丟棄、重新使用或重新循環),來加以處理的過程。
    Connector用以描述零件之間的結合型態,包含了結合強度、工具性和方向性,隨著結合強度和工具的不同,解除的成本也會不一樣,方向性會產生干涉的問題,這會影響解除Connector的作業順序的可執行性。
    第二章以Connector為基,提出兩個表達產品的架構,以訂書機為例,說明兩種架構轉換的過程,第一個架構是Connector-Part圖,其描述了Connector限制哪些Part的自由,透過方向干涉矩陣的整理得知Connector的執行順序後,可以轉換成第二個表達架構-釋放圖。釋放圖描述解除一個Connector時,可以釋放出哪些Part,解除多個Connector後才能獨立的Part則歸於和其接觸且最後一個解除的Connector。
    釋放圖建立後,就能規劃拆裝。規劃順序的演算法,會在每一階段中挑選可執行的Connector利潤最大者來拆解,然後進入下一階段,如此反復執行直到所有的Connector都解除。本章以訂書機為例,講述整個規劃的過程。第四章呈現一個案例實做,從第二章的Connector-Part圖轉成釋放圖到第三章的拆裝順序規劃以電風扇為例,說明整個規劃流程。第五章則說明未來研究的建議。
    Appears in Collections:[Development of Industrial Engineering and Management] 【工業工程與管理系所】博碩士論文

    Files in This Item:

    File SizeFormat
    0KbUnknown1487View/Open


    All items in NCUTIR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback