English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 2928/5721 (51%)
造訪人次 : 374215      線上人數 : 801
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncut.edu.tw/handle/987654321/6190


    題名: Combining Quality Function Deployment and TRIZ to Solve the Drainer Problems
    作者: 張嘉寶
    貢獻者: 工業工程與(工程)管理系
    日期: 2013-04
    上傳時間: 2017-09-30 11:30:31 (UTC+8)
    摘要: A drainer is a very common article in a bathroom or balcony. Wherever the weep hole exists, there is always a drainer. But, the general drainer cannot obstruct cockroaches and stench from the drain. TRIZ method was used to resign and improve the stench and cockroaches problem in this study. In order to solve previous problem, we use quality function deployment (QFD), tech/physical contradictions, and invention principles to find the key point problems and improve them. This study adds a light float in the drainer. When water pours into the drainer, the float in the drain will be opened by water buoyancy. Contrariwise, when water flows out, the float and drain close directly by gravity. Therefore, this drainer can effectively keep from insect pests and bad odor, no matter the water exist or not. © 2013 Springer Science+Business Media New York. (5 refs)
    關聯: Lecture Notes in Electrical Engineering (LNEE)
    顯示於類別:[工業工程與管理系(所)] 【工業工程與管理系所】期刊論文

    文件中的檔案:

    沒有與此文件相關的檔案.



    在NCUTIR中所有的資料項目都受到原著作權保護.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回饋