English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 2928/5721 (51%)
造訪人次 : 376124      線上人數 : 837
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncut.edu.tw/handle/987654321/6292


    題名: Assessing Non-normally Distributed Processes by Interval Estimation of the Incapability Index Cpp
    作者: 林碧川
    貢獻者: 工業工程與(工程)管理系
    日期: 2009-06
    上傳時間: 2017-10-02 14:15:03 (UTC+8)
    摘要: Process capability indices have been widely used in the manufacturing industry. While most studies consider estimation of capability indices for normal processes, comparatively little is known about their behavior in non-normal settings. Greenwich and Jahr-Schaffrath (Int. J. Qual. Reliab. Manage. 1995; 12:58-71) introduced the incapability index Cpp to evaluate processes. In this paper, we explore the interval estimation of the incapability index Cpp for non-normally distributed processes by utilizing seven feasible methods. We further develop an efficient criterion, which is relative coverage, to evaluate the performance of the seven methods. Detailed discussion of simulation results for six non-normally distributed processes is presented. The results display that the bootstrap pivotal method developed by Wasserman (All of Statistics: A Concise Course in Statistical Inference. Springer Science, Business Media, Inc., 2004) is the best feasible method to estimate Cpp. An example is also demonstrated to illustrate how the method may be used in practice. Copyright © 2008 John Wiley & Sons, Ltd. (27 refs)
    關聯: Quality and Reliability Engineering International
    顯示於類別:[工業工程與管理系(所)] 【工業工程與管理系所】期刊論文

    文件中的檔案:

    沒有與此文件相關的檔案.



    在NCUTIR中所有的資料項目都受到原著作權保護.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回饋