勤益科大機構典藏:
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 2928/5721 (51%)
造访人次 : 375465      在线人数 : 184
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻
    【工業工程與管理系所】實務專題 [0/44]
    【工業工程與管理系所】教師著作 [1/1]
    【工業工程與管理系所】演講及研討會資訊 [4/5]
    【工業工程與管理系所】計畫成果報告 [2/3]
    【工業工程與管理系所】博碩士論文 [207/372]
    【工業工程與管理系所】考古題 [70/70]

    类别统计

    近3年内发表的文件:0(0.00%)
    含全文笔数:166(41.81%)

    文件下载次数统计
    下载大于0次:165(99.40%)
    下载大于100次:162(97.59%)
    全文下载总次数:507672(58.91%)

    最后更新时间: 2024-11-28 15:57


    上传排行

    数据加载中.....

    下载排行

    数据加载中.....

    RSS Feed RSS Feed
    跳至:
    或输入年份:
    由新到旧排序 由最旧的开始

    显示项目26-50 / 397. (共16页)
    << < 1 2 3 4 5 6 7 8 9 10 > >>
    每页显示[10|25|50]项目

    日期题名作者
    2013-04 Combining Quality Function Deployment and TRIZ to Solve the Drainer Problems 張嘉寶
    2013-03 Application of RFID on equipment parts readiness management system of semiconductor packaging plant 張嘉寶
    2013-03 An Invention of Pneumatically Powered and Charged LED Flashlight 李國義
    2013-03 A rough sets approach to malfunction diagnosis on air-conditioning system 李鴻濤
    2013-03 the Application of Recurrent Artificial Neural Network in Chiller Energy Analysis Simulationt 洪永祥
    2013-02 Decision support model for employee selection: A strategic Human resource management (HRM) perspective 曾懷恩
    2013-02 Construction of a 3C Product Mold Manufacturing Process Predictive Optimization Model 林文燦
    2013-02 Construction of a 3C Product Mold Manufacturing Process Predictive Optimization Model 黃喬次
    2013-01 A stochastic lot-sizing model with multi-supplier and quantity discount 康鶴耀
    2013-01 Integrating the TRIZ and Taguchi’s Method in the Optimization of Processes Parameters for SMT 林文燦
    2013-01 Application of RFID on Equipment Parts Readiness Management System of Semiconductor Packaging Plant 王偉驎
    2013-01 Application of RFID on Equipment Parts Readiness Management System of Semiconductor Packaging Plant 王樹仁
    2012-11 Application of Systematic Innovative Method to Improve the Structure of Magnetorheological Damper 張嘉寶
    2012-11 Comparison of differences of domestic business promoting TTQS certification performance Erformance Evaluation Models 林文燦
    2012-10 A stochastic lot-sizing model with multi-supplier and quantity discount 康鶴耀
    2012-10 Multi-agent-based negotiation approach for parallel machine scheduling with multi-objective in electro-etching process 廖麗滿
    2012-10 Optimization of a Light Guide Plate Injection Molding Stability Process by Integrating Taguchi Quality Engineering and the Grey Sequencing Method. 林文燦
    2012-10 The Impact of Transparency on Market Quality for the Taiwan Stock Exchange 柯美珠
    2012-10 Multi-agent-based negotiation approach for parallel machine scheduling with multi-objective in electro-etching process 黃敬仁
    2012-09 An integrated replenishment model with quantity discounts, reentry and downward substitution for control wafers 康鶴耀
    2012-09 Improved Process Performance in New Product Development of Optical Communications Manufacturing by the Integration of DFSS and ANP. 林文燦
    2012-09 Determine the Optimum Process Parameters for Ganoderma Lucidum Soybean Fermentation Liquor Polysaccharide Using AHP/DEA 林文燦
    2012-09 Using the Grey theories to Improve the Knapp Test for Injection Ampoule Inspection 林文燦
    2012-09 Analysis of Multi-Objective Planning Dynamic Equilibrium by K-Means of Proportional Distribution for Multi-Objective Particle Swarm Optimization. 林文燦
    2012-09 Fetal distress prediction using discriminant analysis, decision tree, and artificial neural network 黃美玲

    显示项目26-50 / 397. (共16页)
    << < 1 2 3 4 5 6 7 8 9 10 > >>
    每页显示[10|25|50]项目

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回馈