English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 2928/5721 (51%)
造訪人次 : 375849      線上人數 : 562
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋

    社群統計


    近3年內發表的文件:0(0.00%)
    含全文筆數:450(50.51%)

    文件下載次數統計
    下載大於0次:449(99.78%)
    下載大於100次:442(98.22%)
    檔案下載總次數:861613(14.11%)

    最後更新時間: 2024-11-28 11:49

    上傳排行

    資料載入中.....

    下載排行

    資料載入中.....

    RSS Feed RSS Feed
    跳至:
    或輸入年份:
    由新到舊排序 由最舊的開始

    顯示項目451-475 / 891. (共36頁)
    << < 14 15 16 17 18 19 20 21 22 23 > >>
    每頁顯示[10|25|50]項目

    日期題名作者
    2009-03 Improving scheduling of emergency physicians using data mining analysis Yang, C.C.; Lin, W.T.; Chen, H.M.; Shi, Y.H.
    2009-03 On genetic algorithms for shoe making nesting–A Taiwan case Yang, Hsu-Hao; Lin, Chien-Li
    2009-03 The design of a JADE-based autonomous workflow management system for collaborative SoC design Trappey, Charles V.; Trappey, Amy J.C.; Huang, Ching-Jen; Ku, C.C.
    2009-03 Toward developing agility evaluation of mass customization systems using 2-tuple linguistic computing 王文派
    2009-03 A fuzzy AHP-based performance evaluation model for implementing SPC in the Taiwanese LCD industry 黃喬次
    2009-02 A Neural Network Based Prediction Model in Embedded Processes of Gold Wire Bonding Structure for Stacked Die Package 洪永祥
    2009-02 Apply 6-Sigma Methodology in the Kano Quality Model -An example of Stationery Industry 陳水湶
    2009-02 Heuristic algorithms for two-machine flowshop with availability constraints Liao, Li-Man; Tsai, Chin-Hui
    2009-02 Heuristic algorithms for two-machine flowshop with availability constraints 廖麗滿
    2009-02 Improving Scheduling of Emergency Physicians Using Data Mining Analysis. 林文燦
    2009-02 人力品質驗證標準-英國Investor In People制度與應用 林文燦
    2009-02 Applying 6-Sigma Methodology in the Kano Quality Model-An example of Stationery Industry 黃存宏
    2009-01 Complexity Estimation for Genetic Assembly Sequence Planning 王文派
    2009-01 整合ARIMA需求預測之RFID-Enabled供應鏈效益模擬 王樹仁
    2009-01 Inventory replenishment model using fuzzy multiple objective programming: A case study of a high-tech company in Taiwan 康鶴耀
    2009-01 Strategic Selection of Suitable Projects for Hybrid Solar-Wind Power Generation Systems 康鶴耀
    2009-01 Complexity Estimation for Genetic Assembly Sequence Planning 曾懷恩
    2009-01 Multi-criteria decision making on strategic selection of wind farms Lee, Amy H.I.; Chen, Hsing-Hung; Kang, He-Yau
    2009 98年研究所入學試題-生產管理 工業工程與管理系(所)
    2009 98年研究所入學試題-作業研究 工業工程與管理系
    2009 98年研究所入學試題-統計學 工業工程與管理系
    2009 98年研究所入學試題-計算機概論 工業工程與管理系
    2009 98年研究所入學試題-經濟學 工業工程與管理系
    2009 提升能源管理運用六標準差之實證研究─以某政府機關為例 王岳彬; Yueh -Ping Wang; 陳坤盛
    林文燦
    ; Kuen-Suan Chen
    Wen-Tsan Lin
    2009 建構國內企業推行TTQS認證制度績效評估 孔慶瑜; Kung Ching-Yu; 林文燦
    張嘉寶
    ; Wen-Tsan Lin
    Chia-Pao Chang

    顯示項目451-475 / 891. (共36頁)
    << < 14 15 16 17 18 19 20 21 22 23 > >>
    每頁顯示[10|25|50]項目

    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回饋